Craft worked with Gorman and Company to provide 98 affordable housing units (30-60% AMI) directly across from Ruby Hill Park. Site challenges included over 26' of elevation change, large overhead utilities, and an absence of storm sewer to outfall to. Craft provided a creative approach to stormwater detention and grading design, utilizing rooftop detention, bioretention, and underground detention to provide the required stormwater facilities within the parking lot without storm main extension or pump. After extensive collaboration with the design team, the final design resulted in significant cost savings for the project.